Con J. Franke Electric excels at providing superior commercial electrical services to water treatment plants, wastewater treatment facilities, EV charging stations, food service manufacturers, and institutions.

Finished Projects

Here are a few profiles of successfully completed projects.
  • Chevrolet project pumps
  • Chevrolet project chargers
  • Chevrolet project chargers

Epic Chevrolet

Con J. Franke installed (2) 19.2kW Blink Chargers Level 2, (1) 24kw ABB Charger Level 2, and (1) 54kw ABB Charger Level 3 at Epic Chevrolet in Sacramento.

  • Quail Lakes Elementary Exterior
  • Quail Lakes Elementary Exterior

Quail Lakes Elementary School

New K-8 Grammar School for Stockton Unified. Project consists of 2 new modular classrooms, multipurpose building, and admin/library. Site was powered from new 480V PG&E Service and distributed to associated buildings. Site lighting was installed along with new low voltage systems to the buildings.

  • Los Medanos Student Union

Los Medanos College PE and Student Union Complex

This project involved demolition of an existing building and swimming pool. Con J. Franke provided new infrastructure for the new physical education building and a two story student union at Los Medanos Community College in Pittsburg, CA, including fire alarm system, lighting, lighting controls, AV, data, intrusion, cameras, electrical gear, medium voltage cabling.

  • Seaplane Lagoon Sign
  • Seaplane Lagoon Wide Shot
  • Seaplane Lagoon Canopy

Seaplane Lagoon Project

Project consists of Electrical Power Lighting and Low Voltage for new Ferry Terminal at Alameda Sea Plane. Includes installation of lighting on Promenade, Pier, Gangway, and Float. Includes Access Control, Video Surveillance, Clipper Card, and Next Bus Sign.

  • Digester plant outdoors
  • Digester plant electrical panel
  • Digester outdoor controls

San Jose Digester Improvements

Expansive retrofit of the region's largest Wastewater Treatment Facility. Project included the re-construction of (4) digesters with heat exchangers, gas compressors and intertie to the facility's new Cogen Facility. Project included the refurbishment of digested gas valves, piping and controls to (8) existing digesters and the construction of a new Gas Flare unit.